Long Island Point – Timber Pile Inspection – March 2017

Ægir Divers were commissioned by Linx to inspect the timber low landing and fender piles of the Mooring Dolphins at Long Island Point in Westernport Bay.

Divers cleaned the piles using a 4000 psi pressure washer. This method of cleaning allowed for accurate measurements to be taken with a vernier calliper tool. Divers relayed any findings via real time communication to the surface supervisor, to be captured on a data template and transferred to a computer generated report, along with any underwater reference photographs of defects, depletion or observations of interest. A summary of findings was then presented to the client, along with any recommendations for repair if noted.